IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

371

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0504 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,901 $7,000 Implemented
MA0504 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,196 $0 Implemented
MA0502 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,860 $45,850 Not Implemented
MA0502 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $17,998 $40,000 Not Implemented
MA0502 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,461 $6,200 Not Implemented
MA0502 # 04 Y:2001 04 2001 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,510 $15,000 Not Implemented
MA0502 # 05 Y:2001 05 2001 REPLACE BOILER $1,908 $1,908 Not Implemented
MA0502 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,771 $3,000 Not Implemented
MA0493 # 01 Y:2001 01 2001 ADOPT IN-HOUSE MATERIAL GENERATION $48,702 $180,000 Not Implemented
MA0493 # 02 Y:2001 02 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,846 $0 Implemented
MA0493 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,613 $150 Implemented
MA0493 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $2,165 $3,750 Not Implemented
MA0493 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $516 $1,000 Implemented
MA0493 # 06 Y:2001 06 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $161 $100 Implemented
MA0493 # 07 Y:2001 07 2001 PAY BILLS ON TIME TO AVOID LATE FEES $350 $0 Implemented
MA0482 # 01 Y:2001 01 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $19,400 $93,000 Not Implemented
MA0482 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $15,900 $13,000 Not Implemented
MA0482 # 03 Y:2001 03 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,590 $30,000 Not Implemented
MA0482 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,900 $23,000 Not Implemented
MA0482 # 05 Y:2001 05 2001 USE RADIANT HEATER FOR SPOT HEATING $5,430 $25,000 Not Implemented
MA0482 # 06 Y:2001 06 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,200 $13,000 Not Implemented
MA0482 # 07 Y:2001 07 2001 RECYCLE WHITE WATER $5,000 $20,000 Not Implemented
MA0482 # 08 Y:2001 08 2001 METER WASTE WATER $4,400 $12,000 Not Implemented
MA0482 # 09 Y:2001 09 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,040 $450 Implemented
MA0482 # 10 Y:2001 10 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,700 $5,000 Not Implemented