IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0511 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $8,256 $850 Implemented
WI0511 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,167 $8,820 Implemented
WI0511 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,712 $0 Implemented
WI0511 # 05 Y:2006 05 2006 USE SYNTHETIC LUBRICANT $2,149 $0 Implemented
WI0511 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $446 $0 Implemented
WI0511 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $290 $640 Implemented
WI0511 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $283 $150 Implemented
WI0511 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $263 $0 Implemented
LE0231 # 05 Y:2006 05 2006 REPAIR OR REPLACE STEAM TRAPS $21,498 $4,500 Implemented
LE0231 # 06 Y:2006 06 2006 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $17,212 $12,500 Implemented
LE0231 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $16,394 $13,060 Not Implemented
LE0231 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,127 $400 Implemented
LE0231 # 09 Y:2006 09 2006 IMPROVE COMBUSTION CONTROL CAPABILITY $7,881 $2,500 Implemented
LE0231 # 10 Y:2006 10 2006 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,915 $189 Implemented
LE0231 # 11 Y:2006 11 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,485 $3,600 Implemented
LE0231 # 12 Y:2006 12 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,229 $500 Not Implemented
LE0231 # 13 Y:2006 13 2006 INSTALL OCCUPANCY SENSORS $3,076 $300 Not Implemented
LE0231 # 01 Y:2006 01 2006 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $140,853 $660,000 Not Implemented
LE0231 # 02 Y:2006 02 2006 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $128,263 $120,000 Not Implemented
LE0231 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,942 $13,500 Implemented
LE0231 # 04 Y:2006 04 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $26,565 $51,000 Implemented
IA0383 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $901 $215 Implemented
IA0383 # 02 Y:2006 02 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $581 $163 Not Implemented
IA0383 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $371 $25 Implemented
IA0383 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $155 $0 Implemented