Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
102
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0145 # 03 Y:1984 | 03 | 1984 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,148 | $17,000 | Not Implemented |
UD0145 # 02 Y:1984 | 02 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,579 | $19,613 | Implemented |
UD0145 # 01 Y:1984 | 01 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,141 | $36,000 | Not Implemented |
GT0236 # 02 Y:1984 | 02 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,120 | $50 | Implemented |
GT0236 # 03 Y:1984 | 03 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,182 | $0 | Not Implemented |
GT0236 # 04 Y:1984 | 04 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,004 | $0 | Implemented |
GT0236 # 05 Y:1984 | 05 | 1984 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,625 | $5,000 | Not Implemented |
GT0236 # 06 Y:1984 | 06 | 1984 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $356 | $546 | Implemented |
GT0236 # 07 Y:1984 | 07 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,323 | $2,000 | Not Implemented |
GT0236 # 01 Y:1984 | 01 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $49 | $0 | Implemented |
KU0141 # 03 Y:1984 | 03 | 1984 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $5,773 | $14,000 | Not Implemented |
KU0141 # 14 Y:1984 | 14 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,498 | $3,000 | Implemented |
KU0141 # 10 Y:1984 | 10 | 1984 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $420 | $400 | Not Implemented |
KU0141 # 08 Y:1984 | 08 | 1984 | INSULATE BARE EQUIPMENT | $371 | $150 | Not Implemented |
KU0141 # 13 Y:1984 | 13 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $5,927 | $500 | Implemented |
KU0141 # 20 Y:1984 | 20 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $176 | $350 | Implemented |
KU0141 # 17 Y:1984 | 17 | 1984 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $686 | $90 | Implemented |
KU0141 # 05 Y:1984 | 05 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,544 | $6,000 | Not Implemented |
KU0141 # 06 Y:1984 | 06 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,300 | $150 | Implemented |
KU0141 # 18 Y:1984 | 18 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $293 | $0 | Not Implemented |
KU0141 # 21 Y:1984 | 21 | 1984 | MINIMIZE WATER USAGE | $1,575 | $350 | Not Implemented |
KU0141 # 19 Y:1984 | 19 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $899 | $0 | Implemented |
KU0141 # 11 Y:1984 | 11 | 1984 | INSULATE BARE EQUIPMENT | $200 | $375 | Not Implemented |
KU0141 # 07 Y:1984 | 07 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $753 | $1,495 | Not Implemented |
KU0141 # 02 Y:1984 | 02 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,785 | $0 | Implemented |