Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
66
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0557 # 01 Y:2020 | 01 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $34,350 | $150,000 | Implemented |
UF0557 # 06 Y:2020 | 06 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $8,554 | $38,357 | Not Implemented |
UF0557 # 08 Y:2020 | 08 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,710 | $5,998 | Implemented |
UF0557 # 02 Y:2020 | 02 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $33,993 | $25,529 | Implemented |
UF0557 # 03 Y:2020 | 03 | 2020 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $33,607 | $165,000 | Implemented |
UF0557 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,904 | $455 | Implemented |
UF0557 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,870 | $8,850 | Implemented |
UF0557 # 07 Y:2020 | 07 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,282 | $25,340 | Implemented |
UF0557 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $2,548 | $2,336 | Implemented |
UD1025 # 10 Y:2020 | 10 | 2020 | INSTALL EQUIPMENT TO MOVE PRODUCT | $454,408 | $375,000 | Not Implemented |
UD1025 # 04 Y:2020 | 04 | 2020 | INSULATE BARE EQUIPMENT | $83,809 | $25,133 | Not Implemented |
UD1025 # 06 Y:2020 | 06 | 2020 | COMBINE UTILITY METERS | $8,278 | $0 | Not Implemented |
UD1025 # 05 Y:2020 | 05 | 2020 | REDUCE EXCESSIVE BOILER BLOWDOWN | $6,710 | $5,224 | Not Implemented |
UD1025 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,051 | $340 | Implemented |
UD1025 # 03 Y:2020 | 03 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,411 | $4,000 | Not Implemented |
UD1025 # 01 Y:2020 | 01 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,747 | $0 | Not Implemented |
UD1025 # 07 Y:2020 | 07 | 2020 | OPTIMIZE PLANT POWER FACTOR | $3,612 | $7,325 | Not Implemented |
UD1025 # 09 Y:2020 | 09 | 2020 | INSTALL OCCUPANCY SENSORS | $11,875 | $4,845 | Not Implemented |
UD1025 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,963 | $26,366 | Not Implemented |
UA0234 # 01 Y:2020 | 01 | 2020 | MODIFY STARTUP/SHUTDOWN TIMES | $17,505 | $0 | Implemented |
UA0234 # 02 Y:2020 | 02 | 2020 | OPTIMIZE PLANT POWER FACTOR | $1,608 | $7,769 | Not Implemented |
UA0234 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $638 | $850 | Implemented |
UA0234 # 04 Y:2020 | 04 | 2020 | USE PHOTOCELL CONTROLS | $34 | $112 | Not Implemented |
MA0819 # 02 Y:2020 | 02 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $28,022 | $217,000 | Implemented |
MA0819 # 03 Y:2020 | 03 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,833 | $1,000 | Not Implemented |