IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

763

matching recommendations
Reset
SIC 262 Paper Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0103 # 03 Y:1993 03 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $13,102 $3,208 Implemented
AS0103 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,632 $5,588 Implemented
AS0103 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,958 $0 Implemented
AS0103 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,245 $0 Not Implemented
AS0103 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $124 $678 Implemented
AS0103 # 08 Y:1993 08 1993 INSTALL OCCUPANCY SENSORS $4,164 $7,175 Not Implemented
AS0103 # 09 Y:1993 09 1993 INSTALL SET-BACK TIMERS $8,795 $2,025 Not Implemented
ND0165 # 01 Y:1993 01 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $100 $0 Implemented
ND0165 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,650 $160 Implemented
ND0165 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,121 $7,820 Not Implemented
ND0165 # 04 Y:1993 04 1993 REPLACE BOILER $4,125 $7,740 Not Implemented
ND0165 # 05 Y:1993 05 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $102 $320 Not Implemented
ND0165 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $276 $6,620 Implemented
MA0264 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,121 $9,386 Implemented
MA0264 # 02 Y:1993 02 1993 INSTALL OCCUPANCY SENSORS $3,896 $1,274 Implemented
MA0264 # 03 Y:1993 03 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,443 $1,176 Implemented
MA0264 # 04 Y:1993 04 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,451 $1,500 Implemented
MA0264 # 05 Y:1993 05 1993 REDESIGN PROCESS $457 $0 Not Implemented
MA0264 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $134 $180 Not Implemented
MA0235 # 01 Y:1992 01 1992 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $94,715 $181,225 Not Implemented
MA0235 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,460 $14,275 Not Implemented
MA0235 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,525 $24,600 Implemented
MA0235 # 04 Y:1992 04 1992 REPAIR AND ELIMINATE STEAM LEAKS $7,975 $165 Implemented
MA0235 # 05 Y:1992 05 1992 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,141 $584 Not Implemented
MA0234 # 01 Y:1992 01 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $95,700 $153,525 Implemented