Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 262 | Paper Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MAS013 # 06 Y:2011 | 06 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $3,738 | $8,000 | Implemented |
MAS013 # 05 Y:2011 | 05 | 2011 | INSULATE BARE EQUIPMENT | $3,878 | $3,600 | Implemented |
MAS013 # 04 Y:2011 | 04 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $7,289 | $15,000 | Not Implemented |
MAS013 # 03 Y:2011 | 03 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,053 | $0 | Implemented |
MAS013 # 02 Y:2011 | 02 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $21,255 | $20,475 | Implemented |
MAS013 # 01 Y:2011 | 01 | 2011 | UPGRADE OBSOLETE EQUIPMENT | $27,730 | $42,112 | Not Implemented |
MAS013 # 09 Y:2011 | 09 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $784 | $3,500 | Implemented |
MAS013 # 07 Y:2011 | 07 | 2011 | TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS | $2,115 | $150 | Implemented |
MAS013 # 08 Y:2011 | 08 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $942 | $5,000 | Not Implemented |
MA0567 # 01 Y:2004 | 01 | 2004 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $70,900 | $270,000 | Implemented |
MA0567 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $61,633 | $54,474 | Not Implemented |
MA0567 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,220 | $11,950 | Not Implemented |
MA0567 # 04 Y:2004 | 04 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $8,762 | $1,000 | Implemented |
MA0567 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $4,156 | $6,867 | Implemented |
MA0567 # 06 Y:2004 | 06 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $3,942 | $5,000 | Not Implemented |
MA0567 # 07 Y:2004 | 07 | 2004 | INSULATE BARE EQUIPMENT | $1,615 | $1,369 | Implemented |
MA0488 # 02 Y:2001 | 02 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $84,500 | $1,500 | Implemented |
MA0488 # 09 Y:2001 | 09 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,900 | $8,000 | Implemented |
MA0488 # 03 Y:2001 | 03 | 2001 | MINIMIZE WATER USAGE | $25,000 | $0 | Implemented |
MA0488 # 04 Y:2001 | 04 | 2001 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $24,500 | $5,000 | Not Implemented |
MA0488 # 05 Y:2001 | 05 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,500 | $20,000 | Not Implemented |
MA0488 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,025 | $700 | Implemented |
MA0488 # 13 Y:2001 | 13 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,900 | $1,000 | Not Implemented |
MA0488 # 12 Y:2001 | 12 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,000 | $8,000 | Not Implemented |
MA0488 # 11 Y:2001 | 11 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,000 | $8,000 | Not Implemented |