IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

754

matching recommendations
Reset
SIC 2621 Paper Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0590 # 02 Y:2025 02 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,681 $301 n/a
LE0590 # 05 Y:2025 05 2025 ELIMINATE A BY-PRODUCT $24,310 $16,420 n/a
LE0590 # 04 Y:2025 04 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,020 $3,696 n/a
LE0590 # 01 Y:2025 01 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,469 $0 n/a
LE0590 # 06 Y:2025 06 2025 USE SOLAR HEAT TO HEAT WATER $58,205 $636,222 n/a
LE0590 # 08 Y:2025 08 2025 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,163 $4,000 n/a
LE0590 # 09 Y:2025 09 2025 REPLACE BOILER $109,410 $550,000 n/a
LE0590 # 07 Y:2025 07 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,163 $4,000 n/a
LE0590 # 11 Y:2025 11 2025 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $173,183 $1,591,750 n/a
LE0590 # 10 Y:2025 10 2025 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,004 $30,293 n/a
LE0590 # 12 Y:2025 12 2025 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,407 $29,000 n/a
LE0590 # 03 Y:2025 03 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,450 $1,980 n/a
LE0583 # 04 Y:2024 04 2024 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $19,014 $7,000 Implemented
LE0583 # 03 Y:2024 03 2024 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $344,366 $63,000 Implemented
LE0583 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,430 $2,300 Implemented
LE0583 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,486 $0 Not Implemented
LE0583 # 06 Y:2024 06 2024 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,627,510 $8,755,000 Not Implemented
LE0583 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,189 $49,500 Not Implemented
LE0583 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,716 $10,250 Not Implemented
UA0278 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,935 $1,000 Not Implemented
UA0278 # 01 Y:2023 01 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $83,920 $6,036 Implemented
UA0278 # 02 Y:2023 02 2023 RECOVER WASTE HEAT FROM EQUIPMENT $61,473 $64,976 Not Implemented
UA0278 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,819 $1,680 Not Implemented
UA0278 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $9,308 $327 Implemented
UA0278 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,416 $8,163 Implemented