Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
78
matching recommendationsSIC | 2621 | Paper Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0566 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $148,951 | $35,885 | Implemented |
MA0566 # 03 Y:2004 | 03 | 2004 | USE MINIMUM STEAM OPERATING PRESSURE | $75,183 | $1,350 | Not Implemented |
MA0566 # 04 Y:2004 | 04 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $69,926 | $70,000 | Not Implemented |
MA0566 # 05 Y:2004 | 05 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $33,400 | $20,000 | Implemented |
MA0566 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,306 | $16,750 | Not Implemented |
MA0566 # 07 Y:2004 | 07 | 2004 | INSULATE BARE EQUIPMENT | $5,889 | $3,076 | Implemented |
MA0484 # 03 Y:2001 | 03 | 2001 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $54,400 | $290,000 | n/a |
MA0484 # 10 Y:2001 | 10 | 2001 | INSULATE FEEDWATER TANK | $2,000 | $3,000 | Implemented |
MA0484 # 09 Y:2001 | 09 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,200 | $0 | Implemented |
MA0484 # 08 Y:2001 | 08 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,700 | $0 | Implemented |
MA0484 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,800 | $51,800 | Implemented |
MA0484 # 06 Y:2001 | 06 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,000 | $24,000 | Not Implemented |
MA0484 # 05 Y:2001 | 05 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,300 | $12,000 | Implemented |
MA0484 # 04 Y:2001 | 04 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,500 | $9,500 | Implemented |
MA0484 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $62,000 | $35,000 | Not Implemented |
MA0484 # 01 Y:2001 | 01 | 2001 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $254,000 | $120,000 | n/a |
MA0435 # 01 Y:1999 | 01 | 1999 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $689 | $128 | Not Implemented |
MA0435 # 02 Y:1999 | 02 | 1999 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $281 | $328 | Not Implemented |
MA0435 # 03 Y:1999 | 03 | 1999 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $313 | $472 | Implemented |
MA0435 # 04 Y:1999 | 04 | 1999 | INSTALL / REPAIR INSULATION ON STEAM LINES | $521 | $294 | Implemented |
MA0435 # 05 Y:1999 | 05 | 1999 | UPGRADE OBSOLETE EQUIPMENT | $1,957 | $350 | Not Implemented |
MA0435 # 06 Y:1999 | 06 | 1999 | INSTALL OCCUPANCY SENSORS | $590 | $248 | Implemented |
MA0264 # 06 Y:1993 | 06 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $134 | $180 | Not Implemented |
MA0264 # 05 Y:1993 | 05 | 1993 | REDESIGN PROCESS | $457 | $0 | Not Implemented |
MA0264 # 04 Y:1993 | 04 | 1993 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,451 | $1,500 | Implemented |