IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
SIC 2621 Paper Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0566 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $148,951 $35,885 Implemented
MA0566 # 03 Y:2004 03 2004 USE MINIMUM STEAM OPERATING PRESSURE $75,183 $1,350 Not Implemented
MA0566 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $69,926 $70,000 Not Implemented
MA0566 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $33,400 $20,000 Implemented
MA0566 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $22,306 $16,750 Not Implemented
MA0566 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $5,889 $3,076 Implemented
MA0484 # 03 Y:2001 03 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $54,400 $290,000 n/a
MA0484 # 10 Y:2001 10 2001 INSULATE FEEDWATER TANK $2,000 $3,000 Implemented
MA0484 # 09 Y:2001 09 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,200 $0 Implemented
MA0484 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,700 $0 Implemented
MA0484 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,800 $51,800 Implemented
MA0484 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,000 $24,000 Not Implemented
MA0484 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,300 $12,000 Implemented
MA0484 # 04 Y:2001 04 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,500 $9,500 Implemented
MA0484 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $62,000 $35,000 Not Implemented
MA0484 # 01 Y:2001 01 2001 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $254,000 $120,000 n/a
MA0435 # 01 Y:1999 01 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $689 $128 Not Implemented
MA0435 # 02 Y:1999 02 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $281 $328 Not Implemented
MA0435 # 03 Y:1999 03 1999 DIRECT WARMEST AIR TO COMBUSTION INTAKE $313 $472 Implemented
MA0435 # 04 Y:1999 04 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $521 $294 Implemented
MA0435 # 05 Y:1999 05 1999 UPGRADE OBSOLETE EQUIPMENT $1,957 $350 Not Implemented
MA0435 # 06 Y:1999 06 1999 INSTALL OCCUPANCY SENSORS $590 $248 Implemented
MA0264 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $134 $180 Not Implemented
MA0264 # 05 Y:1993 05 1993 REDESIGN PROCESS $457 $0 Not Implemented
MA0264 # 04 Y:1993 04 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,451 $1,500 Implemented