Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 2621 | Paper Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0583 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,189 | $49,500 | n/a |
LE0583 # 06 Y:2024 | 06 | 2024 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,627,510 | $8,755,000 | n/a |
LE0583 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,716 | $10,250 | n/a |
LE0583 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $19,014 | $7,000 | n/a |
LE0583 # 03 Y:2024 | 03 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $344,366 | $63,000 | n/a |
LE0583 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,430 | $2,300 | n/a |
LE0583 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,486 | $0 | n/a |
LE0524 # 10 Y:2022 | 10 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,992 | $24,000 | Not Implemented |
LE0524 # 09 Y:2022 | 09 | 2022 | INCREASE AMOUNT OF CONDENSATE RETURNED | $166,416 | $500,000 | Not Implemented |
LE0524 # 08 Y:2022 | 08 | 2022 | ELIMINATE A BY-PRODUCT | $1,467,534 | $3,000,000 | Not Implemented |
LE0524 # 07 Y:2022 | 07 | 2022 | INCREASE AMOUNT OF CONDENSATE RETURNED | $247,341 | $500,000 | Not Implemented |
LE0524 # 06 Y:2022 | 06 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,341 | $2,100 | Not Implemented |
LE0524 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,876 | $25,340 | Not Implemented |
LE0524 # 04 Y:2022 | 04 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,786 | $5,740 | Not Implemented |
LE0524 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,133 | $7,750 | Implemented |
LE0524 # 02 Y:2022 | 02 | 2022 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $131,350 | $40,000 | Implemented |
LE0524 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,559 | $100 | Not Implemented |
LE0524 # 11 Y:2022 | 11 | 2022 | REPLACE BOILER | $461,406 | $4,000,000 | Implemented |
LE0236 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $123,125 | $25,000 | Not Implemented |
LE0236 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,686 | $300 | Not Implemented |
LE0236 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,742 | $300 | Not Implemented |
LE0236 # 06 Y:2006 | 06 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,063 | $2,750 | Not Implemented |
LE0236 # 05 Y:2006 | 05 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $15,083 | $2,500 | Implemented |
LE0236 # 04 Y:2006 | 04 | 2006 | OPTIMIZE PLANT POWER FACTOR | $22,758 | $42,650 | Not Implemented |
LE0236 # 03 Y:2006 | 03 | 2006 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $23,441 | $17,600 | Not Implemented |