IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 2631 Paperboard Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0697 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $659 $500 Not Implemented
MA0697 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,452 $8,700 Not Implemented
MA0697 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,779 $3,600 Implemented
MA0697 # 05 Y:2012 05 2012 PAY UTILITY BILLS ON TIME $11,678 $500 Implemented
MA0697 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $10,370 $3,000 Implemented
MA0697 # 03 Y:2012 03 2012 IMPROVE COMBUSTION CONTROL CAPABILITY $23,122 $100,000 Not Implemented
MA0697 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $67,234 $180,000 Not Implemented
MA0697 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $82,439 $22,540 Not Implemented
MA0525 # 06 Y:2002 06 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $101 $0 Implemented
MA0525 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $80 $300 Not Implemented
MA0525 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $425 $596 Implemented
MA0525 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $582 $200 Implemented
MA0525 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $791 $0 Implemented
MA0525 # 02 Y:2002 02 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $1,687 $5,159 Not Implemented
MA0525 # 01 Y:2002 01 2002 AIR CONDITION ONLY SPACE NECESSARY $10,201 $800 Implemented
MA0371 # 01 Y:1996 01 1996 RECOVER WASTE HEAT FROM EQUIPMENT $71,639 $68,000 Not Implemented
MA0371 # 05 Y:1996 05 1996 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,688 $2,508 Not Implemented
MA0371 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $39,790 $174,574 Implemented
MA0371 # 03 Y:1996 03 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $22,269 $15,000 Implemented
MA0371 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,504 $0 Implemented