Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,551
matching recommendationsSIC | 265 | Paperboard Containers And Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0164 # 04 Y:1985 | 04 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,000 | $13,000 | Not Implemented |
KU0157 # 01 Y:1985 | 01 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $19,738 | $2,752 | Not Implemented |
KU0157 # 02 Y:1985 | 02 | 1985 | IMPROVE LUBRICATION PRACTICES | $1,569 | $290 | Implemented |
KU0157 # 03 Y:1985 | 03 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,260 | $4,000 | Implemented |
KU0157 # 04 Y:1985 | 04 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,889 | $1,550 | Implemented |
KU0157 # 05 Y:1985 | 05 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $759 | $1,016 | Implemented |
KU0157 # 06 Y:1985 | 06 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,893 | $1,500 | Implemented |
KU0157 # 07 Y:1985 | 07 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $899 | $1,480 | Implemented |
KU0157 # 08 Y:1985 | 08 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $357 | $0 | Implemented |
KU0157 # 09 Y:1985 | 09 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $745 | $1,100 | Implemented |
GT0236 # 01 Y:1984 | 01 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $49 | $0 | Implemented |
GT0236 # 02 Y:1984 | 02 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,120 | $50 | Implemented |
GT0236 # 03 Y:1984 | 03 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,182 | $0 | Not Implemented |
GT0236 # 04 Y:1984 | 04 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,004 | $0 | Implemented |
GT0236 # 05 Y:1984 | 05 | 1984 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,625 | $5,000 | Not Implemented |
GT0236 # 06 Y:1984 | 06 | 1984 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $356 | $546 | Implemented |
GT0236 # 07 Y:1984 | 07 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,323 | $2,000 | Not Implemented |
KU0134 # 01 Y:1984 | 01 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $22,362 | $30,000 | Not Implemented |
KU0134 # 02 Y:1984 | 02 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,178 | $22,400 | Not Implemented |
KU0134 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,241 | $3,991 | Implemented |
KU0134 # 04 Y:1984 | 04 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,694 | $3,800 | Implemented |
KU0134 # 05 Y:1984 | 05 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,505 | $986 | Implemented |
KU0134 # 06 Y:1984 | 06 | 1984 | INSTALL TURBULATORS | $3,913 | $700 | Not Implemented |
KU0134 # 07 Y:1984 | 07 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $2,701 | $0 | Implemented |
KU0134 # 08 Y:1984 | 08 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $1,739 | $3,900 | Not Implemented |