Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,572
matching recommendationsSIC | 265 | Paperboard Containers And Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0033 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $150,000 | $200,000 | n/a |
KS2430 # 04 Y:2024 | 04 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,172 | $5,121 | n/a |
KS2430 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,174 | $9,216 | n/a |
KS2430 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,137 | $60 | n/a |
KS2430 # 06 Y:2024 | 06 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $93,352 | $684,000 | n/a |
KS2430 # 05 Y:2024 | 05 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,954 | $60,601 | n/a |
KS2430 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $53,570 | $460,976 | n/a |
NT0023 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,899 | $15,284 | Not Implemented |
NT0023 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,130 | $17,836 | Not Implemented |
NT0023 # 06 Y:2024 | 06 | 2024 | CHANGE OPERATING CONDITIONS | $150,000 | $616,838 | Not Implemented |
NT0023 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $36,182 | $16,564 | Implemented |
NT0023 # 04 Y:2024 | 04 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $7,720 | $0 | Implemented |
NT0023 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,070 | $5,609 | Implemented |
UF0612 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $44,735 | $34,020 | Implemented |
UF0612 # 03 Y:2024 | 03 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $45,994 | $20,000 | Implemented |
UF0612 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,865 | $8,523 | Implemented |
UF0612 # 09 Y:2024 | 09 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $5,236 | $6,087 | Not Implemented |
UF0612 # 01 Y:2024 | 01 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $402,389 | $1,529,500 | Not Implemented |
UF0612 # 10 Y:2024 | 10 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,066 | $2,320 | Implemented |
UF0612 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $55,068 | $30,945 | Implemented |
UF0612 # 06 Y:2024 | 06 | 2024 | INSTALL TURBULATORS | $13,749 | $3,750 | Implemented |
UF0612 # 07 Y:2024 | 07 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $9,443 | $21,120 | Not Implemented |
UF0612 # 08 Y:2024 | 08 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $7,481 | $5,900 | Implemented |
NL0092 # 04 Y:2023 | 04 | 2023 | COMBINE UTILITY METERS | $948 | $1,000 | n/a |
NL0092 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,226 | $2,000 | n/a |