IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0202 # 02 Y:1997 02 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,445 $8,160 Not Implemented
AS0202 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,839 $12 Implemented
AS0202 # 04 Y:1997 04 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,907 $3,500 Not Implemented
AS0202 # 05 Y:1997 05 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,182 $3,000 Implemented
AS0202 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,084 $9,599 Implemented
AS0202 # 08 Y:1997 08 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,753 $0 Not Implemented
AS0202 # 09 Y:1997 09 1997 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT $665 $0 Implemented
AS0202 # 10 Y:1997 10 1997 TREAT AND REUSE RINSE WATERS $940 $500 Implemented
AS0202 # 11 Y:1997 11 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,407 $200 Not Implemented
AS0202 # 12 Y:1997 12 1997 CLEAR AND RENT EXISTING SPACE $93,500 $750 Not Implemented
AS0034 # 02 Y:1991 02 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,714 $1,000 Not Implemented
AS0034 # 01 Y:1991 01 1991 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $175,405 $0 Not Implemented
AS0034 # 03 Y:1991 03 1991 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,459 $100,000 Not Implemented
AS0034 # 04 Y:1991 04 1991 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $648 $796 Not Implemented
AS0034 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $9,504 $1,290 Not Implemented
AS0034 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,368 $356 Not Implemented
AS0034 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $831 $935 Not Implemented
AS0034 # 08 Y:1991 08 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,428 $300 Not Implemented
AS0034 # 09 Y:1991 09 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,445 $0 Not Implemented
AS0034 # 10 Y:1991 10 1991 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,496 $190 Not Implemented
AS0034 # 11 Y:1991 11 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $343 $595 Not Implemented
AS0034 # 12 Y:1991 12 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $459 $0 Not Implemented