IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,551

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0569 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,180 $18,800 Implemented
UD0477 # 09 Y:1995 09 1995 RECOVER AND REUSE COOLING WATER $16,375 $7,500 Implemented
UD0477 # 01 Y:1995 01 1995 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $1,927 $0 Implemented
UD0477 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $6,045 $4,000 Implemented
UD0477 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,867 $5,759 Implemented
UD0477 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,444 $4,300 Implemented
UD0477 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,196 $21,000 Implemented
UD0477 # 06 Y:1995 06 1995 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,150 $250 Implemented
UD0477 # 07 Y:1995 07 1995 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,625 $600 Not Implemented
UD0477 # 08 Y:1995 08 1995 RECOVER AND REUSE COOLING WATER $10,234 $2,500 Not Implemented
NV0041 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,423 $489 Implemented
NV0041 # 02 Y:1995 02 1995 INSULATE BARE EQUIPMENT $4,791 $1,203 Not Implemented
NV0041 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $259 $843 Not Implemented
NV0041 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $692 $361 Not Implemented
UL0138 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,046 $6,889 Not Implemented
UL0138 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $408 $725 Not Implemented
UL0138 # 03 Y:1995 03 1995 OPTIMIZE PLANT POWER FACTOR $28,107 $27,720 Not Implemented
UL0138 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,945 $50 Not Implemented
UL0138 # 05 Y:1995 05 1995 OPTIMIZE PLANT POWER FACTOR $4,224 $3,600 Not Implemented
UL0138 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,170 $60 Not Implemented
UL0138 # 07 Y:1995 07 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,987 $2,000 Not Implemented
BD0044 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,319 $10,060 n/a
BD0044 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,809 $675 n/a
BD0044 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,917 $754 n/a
BD0044 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $468 $300 n/a