IAC logo
IAC Assessment: GT0569
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0569
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1995
Principal Product Flour Mixes
NAICS n/a
SIC 2657 - Folding Paperboard Boxes
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 130,000
Annual Production 18,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $261,151 4,267,292 kWh $0.06
Natural Gas $47,185 7,597 MMBtu $6.21
TOTAL ENERGY COSTS $1,199,336
RECOMMENDED SAVINGS* $836,706 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,516
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,180
Cost:
$18,800
$3,180 63,013 - - - - $3,180
63,013
kWh
-
-
MMBtu
-
-
lb
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,410
Cost:
$690
$1,410 28,136 - - - - $1,410
28,136
kWh
-
-
MMBtu
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,090
Cost:
$13,600
$7,090 140,680 - - - - $7,090
140,680
kWh
-
-
MMBtu
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,190
Cost:
$200
$4,190 83,236 - - - - $4,190
83,236
kWh
-
-
MMBtu
-
-
lb
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,740
Cost:
-
$1,740 34,584 - - - - $1,740
34,584
kWh
-
-
MMBtu
-
-
lb
06: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$136
Cost:
-
- - $136 38 - - -
-
kWh
$136
38
MMBtu
-
-
lb
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,960
Cost:
$120
$1,960 38,980 - - - - $1,960
38,980
kWh
-
-
MMBtu
-
-
lb
08: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$817,000
Cost:
$255,250
$(-74,000) (-811,841) - - $891,000 575,000 $(-74,000)
(-811,841)
kWh
-
-
MMBtu
$891,000
575,000
lb
TOTAL RECOMMENDED Savings:
$836,706
Cost:
$288,660
$(-54,430) (-423,212) $136 38 $891,000 575,000 $(-54,430)
(-423,212)
kWh
$136
38
MMBtu
$891,000
575,000
lb
TOTAL IMPLEMENTED Savings:
$15,516
Cost:
$33,210
$15,380 305,393 $136 38 - - $15,380
305,393
kWh
$136
38
MMBtu
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)