IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0642 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,265 $10 Implemented
OK0642 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,120 $900 Implemented
OK0642 # 01 Y:2002 01 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,760 $9,780 Implemented
OK0642 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,998 $15,836 Not Implemented
OK0642 # 09 Y:2002 09 2002 $35,955 $0 Not Implemented
OK0642 # 08 Y:2002 08 2002 $245,550 $11,639 Not Implemented
OK0642 # 07 Y:2002 07 2002 AIR CONDITION ONLY SPACE NECESSARY $446 $0 Implemented
OK0642 # 06 Y:2002 06 2002 INSTALL SET-BACK TIMERS $2,130 $332 Implemented
OK0642 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $711 $450 Not Implemented
OK0447 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $815 $2,199 Implemented
OK0447 # 07 Y:1994 07 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $43,497 $198,000 Not Implemented
OK0447 # 04 Y:1994 04 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,581 $2,618 Not Implemented
OK0447 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,652 $832 Implemented
OK0447 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,233 $8,800 Implemented
OK0447 # 02 Y:1994 02 1994 INSULATE BARE EQUIPMENT $505 $526 Implemented
OK0447 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,645 $0 Not Implemented
OK0287 # 04 Y:1989 04 1989 INSULATE BARE EQUIPMENT $480 $245 Not Implemented
OK0287 # 05 Y:1989 05 1989 INSTALL TIMERS AND/OR THERMOSTATS $389 $980 Implemented
OK0287 # 06 Y:1989 06 1989 USE RADIANT HEATER FOR SPOT HEATING $2,087 $12,000 Implemented
OK0287 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $490 $456 Not Implemented
OK0287 # 02 Y:1989 02 1989 INSULATE BARE EQUIPMENT $492 $308 Not Implemented
OK0287 # 03 Y:1989 03 1989 IMPROVE LUBRICATION PRACTICES $438 $5,122 Implemented
OK0197 # 01 Y:1986 01 1986 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $2,964 $3,200 Implemented
OK0197 # 08 Y:1986 08 1986 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,916 $249 Implemented
OK0197 # 09 Y:1986 09 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $76 $47 Implemented