Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
149
matching recommendationsSIC | 265 | Paperboard Containers And Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL0144 # 04 Y:1995 | 04 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $993 | $40 | n/a |
UL0144 # 05 Y:1995 | 05 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $366 | $20 | n/a |
UL0144 # 03 Y:1995 | 03 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $444 | $170 | n/a |
UL0144 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $375 | $854 | n/a |
UL0144 # 01 Y:1995 | 01 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,436 | $2,000 | n/a |
UL0143 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,882 | $5,564 | n/a |
UL0143 # 03 Y:1995 | 03 | 1995 | OPTIMIZE PLANT POWER FACTOR | $20,656 | $19,584 | n/a |
UL0143 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $957 | $1,539 | n/a |
UL0143 # 05 Y:1995 | 05 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,522 | $20 | n/a |
UL0143 # 04 Y:1995 | 04 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,980 | $40 | n/a |
GT0569 # 07 Y:1995 | 07 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,960 | $120 | Implemented |
GT0569 # 06 Y:1995 | 06 | 1995 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $136 | $0 | Implemented |
GT0569 # 05 Y:1995 | 05 | 1995 | USE SYNTHETIC LUBRICANT | $1,740 | $0 | Implemented |
GT0569 # 04 Y:1995 | 04 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,190 | $200 | Not Implemented |
GT0569 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,090 | $13,600 | Implemented |
GT0569 # 02 Y:1995 | 02 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,410 | $690 | Implemented |
GT0569 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,180 | $18,800 | Implemented |
GT0569 # 08 Y:1995 | 08 | 1995 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $817,000 | $255,250 | Not Implemented |
UD0477 # 05 Y:1995 | 05 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,196 | $21,000 | Implemented |
UD0477 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,444 | $4,300 | Implemented |
UD0477 # 02 Y:1995 | 02 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,045 | $4,000 | Implemented |
UD0477 # 07 Y:1995 | 07 | 1995 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $1,625 | $600 | Not Implemented |
UD0477 # 06 Y:1995 | 06 | 1995 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,150 | $250 | Implemented |
UD0477 # 09 Y:1995 | 09 | 1995 | RECOVER AND REUSE COOLING WATER | $16,375 | $7,500 | Implemented |
UD0477 # 01 Y:1995 | 01 | 1995 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $1,927 | $0 | Implemented |