IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0430 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,949 $800 Implemented
SD0430 # 01 Y:2010 01 2010 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $264 $0 Not Implemented
SD0430 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,250 $1,671 Not Implemented
SD0430 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $1,126 $1,029 Not Implemented
SD0430 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,152 $100 Not Implemented
IC0176 # 08 Y:2010 08 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $205 $0 Implemented
IC0176 # 07 Y:2010 07 2010 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,677 $40,071 Implemented
IC0176 # 06 Y:2010 06 2010 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,358 $5,900 Not Implemented
IC0176 # 05 Y:2010 05 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $858 $0 Not Implemented
IC0176 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $317 $1,315 Not Implemented
IC0176 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,215 $441 Not Implemented
IC0176 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,067 $1,035 Implemented
IC0176 # 04 Y:2010 04 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $880 $519 Not Implemented
LE0303 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,909 $1,500 Not Implemented
LE0303 # 02 Y:2010 02 2010 INSTALL TIMERS AND/OR THERMOSTATS $10,520 $650 Implemented
LE0303 # 07 Y:2010 07 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,824 $3,000 Not Implemented
LE0303 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,385 $2,200 Not Implemented
LE0303 # 05 Y:2010 05 2010 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,574 $7,000 Not Implemented
LE0303 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,931 $25,900 Not Implemented
LE0303 # 11 Y:2010 11 2010 RECOVER WASTE HEAT FROM EQUIPMENT $973 $1,000 Implemented
LE0303 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,348 $1,672 Implemented
LE0303 # 08 Y:2010 08 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,378 $3,000 Not Implemented
LE0303 # 09 Y:2010 09 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,351 $800 Implemented
LE0303 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,131 $15 Implemented
AM0568 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,655 $2,000 Not Implemented