Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 265 | Paperboard Containers And Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0092 # 01 Y:2023 | 01 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,092 | $3,305 | n/a |
NL0092 # 02 Y:2023 | 02 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,380 | $140 | n/a |
NL0092 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,226 | $2,000 | n/a |
NL0092 # 04 Y:2023 | 04 | 2023 | COMBINE UTILITY METERS | $948 | $1,000 | n/a |
NL0092 # 05 Y:2023 | 05 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $665 | $1,360 | n/a |
NL0092 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $580 | $105 | n/a |
NT0014 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,512 | $0 | Implemented |
NT0014 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $2,486 | $1,441 | Implemented |
NT0014 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $955 | $0 | Implemented |
NT0014 # 02 Y:2023 | 02 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,006 | $6,160 | Implemented |
NT0014 # 01 Y:2023 | 01 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,483 | $1,258 | Implemented |
NL0079 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,509 | $4,500 | Implemented |
NL0079 # 08 Y:2023 | 08 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,809 | $2,875 | Implemented |
NL0079 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,699 | $10,600 | Implemented |
NL0079 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,949 | $768 | Implemented |
NL0079 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,292 | $128 | Implemented |
NL0079 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,953 | $392 | Implemented |
NL0079 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,356 | $2,892 | Implemented |
NL0079 # 01 Y:2023 | 01 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $30,717 | $54,394 | Implemented |
DL0218 # 06 Y:2023 | 06 | 2023 | INSTALL SET-BACK TIMERS | $473 | $1,000 | Not Implemented |
DL0218 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,159 | $10,000 | Implemented |
DL0218 # 04 Y:2023 | 04 | 2023 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $10,992 | $10,000 | Not Implemented |
DL0218 # 03 Y:2023 | 03 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,402 | $750 | Implemented |
DL0218 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $90,882 | $0 | Implemented |
DL0218 # 01 Y:2023 | 01 | 2023 | REDUCE VENTILATION AIR | $11,809 | $0 | Implemented |