IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

129

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0112 # 03 Y:1997 03 1997 DIRECT WARMEST AIR TO COMBUSTION INTAKE $223 $88 n/a
SF0112 # 04 Y:1997 04 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $16,103 $4,704 n/a
SF0112 # 05 Y:1997 05 1997 METER WASTE WATER $69,902 $60,000 n/a
ME0209 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,155 $8,223 Not Implemented
ME0209 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,912 $32,046 Implemented
ME0209 # 03 Y:1997 03 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,434 $1,980 Not Implemented
ME0209 # 04 Y:1997 04 1997 INSULATE BARE EQUIPMENT $5,853 $925 Implemented
ME0209 # 05 Y:1997 05 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,583 $486 Not Implemented
ME0209 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,024 $0 Implemented
ME0209 # 07 Y:1997 07 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $930 $30 Not Implemented
ME0209 # 08 Y:1997 08 1997 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $662 $0 Not Implemented
ME0209 # 09 Y:1997 09 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $432 $91 Implemented
ME0209 # 10 Y:1997 10 1997 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $36,223 $200,000 Implemented
ME0209 # 11 Y:1997 11 1997 MINIMIZE WATER USAGE $222 $110 Not Implemented
DS0080 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,720 $12,717 Implemented
DS0080 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $453 $3,281 Implemented
DS0080 # 03 Y:1997 03 1997 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,856 $2,388 Not Implemented
DS0080 # 04 Y:1997 04 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $39,032 $2,500 Not Implemented
DS0080 # 05 Y:1997 05 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,150 $1,100 Implemented
DS0080 # 06 Y:1997 06 1997 RECOVER AND REUSE WASTE MATERIAL $48,600 $25,000 Not Implemented
DS0080 # 07 Y:1997 07 1997 INCREASE USE OF AUTOMATION $592,801 $1,500,000 Not Implemented
AM0291 # 01 Y:1997 01 1997 RECOVER AND REUSE COOLING WATER $7,000 $4,100 Implemented
AM0291 # 02 Y:1997 02 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $3,100 $5,630 Implemented
AM0291 # 03 Y:1997 03 1997 ADD AREA LIGHTING SWITCHES $2,150 $1,290 Not Implemented
AM0291 # 04 Y:1997 04 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,100 $2,500 Implemented