IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

220

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0417 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,670 $880 Implemented
AM0417 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,100 $780 Implemented
AM0417 # 08 Y:2002 08 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $440 $0 Implemented
AM0417 # 09 Y:2002 09 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $380 $0 Not Implemented
TA0014 # 01 Y:2001 01 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,969 $1,900 Implemented
TA0014 # 02 Y:2001 02 2001 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $8,100 $11,960 Implemented
TA0014 # 03 Y:2001 03 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,675 $170 Implemented
TA0014 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $1,516 $320 Implemented
TA0014 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,011 $989 Implemented
TA0014 # 06 Y:2001 06 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $663 $150 Not Implemented
TA0014 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $185 $345 Implemented
AM0320 # 01 Y:1998 01 1998 REDUCE SCRAP PRODUCTION $38,400 $0 Implemented
AM0320 # 02 Y:1998 02 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,390 $1,600 Not Implemented
AM0320 # 03 Y:1998 03 1998 METER WASTE WATER $2,300 $6,200 Not Implemented
AM0320 # 04 Y:1998 04 1998 RECOVER AND REUSE COOLING WATER $2,200 $3,000 Not Implemented
AM0320 # 05 Y:1998 05 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,600 $0 Not Implemented
AM0320 # 06 Y:1998 06 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,290 $30 Implemented
AM0320 # 07 Y:1998 07 1998 PAY BILLS ON TIME TO AVOID LATE FEES $763 $0 Implemented
AM0320 # 08 Y:1998 08 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $390 $0 Implemented
AM0320 # 09 Y:1998 09 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $265 $635 Implemented
AM0291 # 01 Y:1997 01 1997 RECOVER AND REUSE COOLING WATER $7,000 $4,100 Implemented
AM0291 # 02 Y:1997 02 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $3,100 $5,630 Implemented
AM0291 # 03 Y:1997 03 1997 ADD AREA LIGHTING SWITCHES $2,150 $1,290 Not Implemented
AM0291 # 04 Y:1997 04 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,100 $2,500 Implemented
AM0291 # 05 Y:1997 05 1997 REPAIR AND ELIMINATE STEAM LEAKS $1,980 $210 Implemented