IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,547

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0053 # 02 Y:1989 02 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,434 $4,320 Not Implemented
RU0053 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $970 $298 Not Implemented
RU0053 # 04 Y:1989 04 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,276 $0 Implemented
RU0053 # 05 Y:1989 05 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,839 $1,600 Not Implemented
RU0053 # 06 Y:1989 06 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $509 $168 Implemented
AM0061 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,000 $270 Implemented
AM0061 # 02 Y:1989 02 1989 OPTIMIZE PLANT POWER FACTOR $18,950 $29,790 Implemented
AM0061 # 03 Y:1989 03 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,660 $19,050 Not Implemented
AM0061 # 04 Y:1989 04 1989 INSULATE BARE EQUIPMENT $2,990 $1,000 Implemented
AM0061 # 05 Y:1989 05 1989 REPAIR AND ELIMINATE STEAM LEAKS $3,029 $840 Implemented
AM0061 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,490 $540 Not Implemented
AM0061 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,275 $500 Implemented
AM0061 # 08 Y:1989 08 1989 IMPROVE LUBRICATION PRACTICES $745 $0 Not Implemented
AM0061 # 09 Y:1989 09 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83 $80 Not Implemented
KU0271 # 01 Y:1989 01 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,720 $6,000 Not Implemented
KU0271 # 02 Y:1989 02 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $5,826 $297 Implemented
KU0271 # 03 Y:1989 03 1989 KEEP BOILER TUBES CLEAN $5,300 $1,500 Implemented
KU0271 # 04 Y:1989 04 1989 INSULATE BARE EQUIPMENT $3,940 $900 Not Implemented
KU0271 # 05 Y:1989 05 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,327 $6,000 Not Implemented
KU0271 # 06 Y:1989 06 1989 USE RADIANT HEATER FOR SPOT HEATING $3,371 $6,000 Not Implemented
KU0271 # 07 Y:1989 07 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,406 $100 Implemented
KU0271 # 08 Y:1989 08 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,370 $7,134 Implemented
KU0271 # 09 Y:1989 09 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,445 $1,500 Implemented
KU0271 # 10 Y:1989 10 1989 TREAT AND REUSE RINSE WATERS $1,110 $1,500 Not Implemented
WI0043 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $10,215 $0 Not Implemented