IAC logo
IAC Assessment: OR0050
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0050
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1989
Principal Product CORRUGATED BOXES
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 109
Plant Area (Sq.Ft.) 0
Annual Production 600,000 Thousand Feet
Production Hrs. Annual 6,120
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $166,282 3,463,658 kWh $0.05
Natural Gas $90,182 37,598 MMBtu $2.40
TOTAL ENERGY COSTS $256,464
RECOMMENDED SAVINGS* $12,452 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,218
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,268
Cost:
$500
- - $5,268 2,195 - - -
-
kWh
$5,268
2,195
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,546
Cost:
$378
- - $1,546 644 - - -
-
kWh
$1,546
644
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$835
Cost:
$250
$835 17,292 - - - - $835
17,292
kWh
-
-
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,554
Cost:
$650
- - $1,554 648 - - -
-
kWh
$1,554
648
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,538
Cost:
$546
$1,380 28,722 - - $158 - $1,380
28,722
kWh
-
-
MMBtu
$158
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$198
Cost:
$76
$198 4,103 - - - - $198
4,103
kWh
-
-
MMBtu
-
-
$
07: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$244
Cost:
$267
- - $244 102 - - -
-
kWh
$244
102
MMBtu
-
-
$
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$379
Cost:
$300
- - $379 158 - - -
-
kWh
$379
158
MMBtu
-
-
$
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$890
Cost:
$2,250
$890 - - - - - $890
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$12,452
Cost:
$5,217
$3,303 50,117 $8,991 3,747 $158 - $3,303
50,117
kWh
$8,991
3,747
MMBtu
$158
-
$
TOTAL IMPLEMENTED Savings:
$8,218
Cost:
$1,672
$2,413 50,117 $5,647 2,353 $158 - $2,413
50,117
kWh
$5,647
2,353
MMBtu
$158
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes