Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
149
matching recommendationsSIC | 2653 | Corrugated And Solid Fiber Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0612 # 01 Y:2024 | 01 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $402,389 | $1,529,500 | n/a |
UF0612 # 08 Y:2024 | 08 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $7,481 | $5,900 | n/a |
UF0612 # 07 Y:2024 | 07 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $9,443 | $21,120 | n/a |
UF0612 # 06 Y:2024 | 06 | 2024 | INSTALL TURBULATORS | $13,749 | $3,750 | n/a |
UF0612 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,865 | $8,523 | n/a |
UF0612 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $44,735 | $34,020 | n/a |
UF0612 # 03 Y:2024 | 03 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $45,994 | $20,000 | n/a |
UF0612 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $55,068 | $30,945 | n/a |
UF0612 # 09 Y:2024 | 09 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $5,236 | $6,087 | n/a |
UF0612 # 10 Y:2024 | 10 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,066 | $2,320 | n/a |
UF0391 # 13 Y:2006 | 13 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $63,455 | $0 | Not Implemented |
UF0391 # 16 Y:2006 | 16 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $10,320 | $0 | Not Implemented |
UF0391 # 02 Y:2006 | 02 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,932 | $0 | Implemented |
UF0391 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,054 | $403 | Implemented |
UF0391 # 14 Y:2006 | 14 | 2006 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $83,200 | $5,350 | Not Implemented |
UF0391 # 09 Y:2006 | 09 | 2006 | USE OPTIMUM THICKNESS INSULATION | $325 | $84 | Implemented |
UF0391 # 08 Y:2006 | 08 | 2006 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $803 | $0 | Implemented |
UF0391 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,307 | $10,651 | Not Implemented |
UF0391 # 06 Y:2006 | 06 | 2006 | CLOSE OFF UNNEEDED STEAM LINES | $9,659 | $0 | Implemented |
UF0391 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,679 | $0 | Implemented |
UF0391 # 04 Y:2006 | 04 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $8,241 | $404 | Implemented |
UF0391 # 10 Y:2006 | 10 | 2006 | USE OPTIMUM THICKNESS INSULATION | $324 | $372 | Not Implemented |
UF0391 # 15 Y:2006 | 15 | 2006 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $17,472 | $0 | Not Implemented |
UF0391 # 01 Y:2006 | 01 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $24,522 | $41,500 | Not Implemented |
UF0391 # 11 Y:2006 | 11 | 2006 | INSTALL OCCUPANCY SENSORS | $286 | $228 | Not Implemented |