IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0196 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $222 $527 Not Implemented
AR0196 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $197 $0 Not Implemented
AR0196 # 04 Y:2000 04 2000 DEVELOP STANDARD OPERATING PROCEDURES $3,510 $0 Not Implemented
AR0196 # 05 Y:2000 05 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $46,800 $4,050 Not Implemented
AR0196 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $426 $60 Not Implemented
WV0198 # 10 Y:2000 10 2000 CLEAR AND RENT EXISTING SPACE $6,000 $100 Not Implemented
WV0198 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $782 $416 Not Implemented
WV0198 # 07 Y:2000 07 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $22,060 $0 Implemented
WV0198 # 09 Y:2000 09 2000 ELIMINATE LEAKS IN WATER LINES AND VALVES $15,135 $20,000 Not Implemented
WV0198 # 08 Y:2000 08 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,141 $23 Implemented
WV0198 # 11 Y:2000 11 2000 INSTALL SENSORS TO DETECT DEFECTS $8,580 $125 Implemented
WV0198 # 04 Y:2000 04 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,768 $800 Implemented
WV0198 # 02 Y:2000 02 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,865 $4,220 Not Implemented
WV0198 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $3,752 $169 Implemented
WV0198 # 01 Y:2000 01 2000 USE SYNTHETIC LUBRICANT $1,154 $560 Implemented
WV0198 # 05 Y:2000 05 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,552 $500 Not Implemented
WV0195 # 11 Y:2000 11 2000 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $11,700 $500 Implemented
WV0195 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $531 $154 Not Implemented
WV0195 # 08 Y:2000 08 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $4,000 $863 Implemented
WV0195 # 07 Y:2000 07 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $908 $912 Implemented
WV0195 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,494 $664 Implemented
WV0195 # 04 Y:2000 04 2000 REPAIR OR REPLACE STEAM TRAPS $2,348 $1,368 Implemented
WV0195 # 09 Y:2000 09 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,880 $100 Implemented
WV0195 # 03 Y:2000 03 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $937 $500 Not Implemented
WV0195 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $6,939 $3,252 Implemented