Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 2653 | Corrugated And Solid Fiber Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0176 # 08 Y:2010 | 08 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $205 | $0 | Implemented |
IC0176 # 07 Y:2010 | 07 | 2010 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,677 | $40,071 | Implemented |
IC0176 # 06 Y:2010 | 06 | 2010 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,358 | $5,900 | Not Implemented |
IC0176 # 01 Y:2010 | 01 | 2010 | INSTALL OCCUPANCY SENSORS | $317 | $1,315 | Not Implemented |
IC0176 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,215 | $441 | Not Implemented |
IC0176 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,067 | $1,035 | Implemented |
IC0176 # 04 Y:2010 | 04 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $880 | $519 | Not Implemented |
IC0176 # 05 Y:2010 | 05 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $858 | $0 | Not Implemented |
LE0303 # 07 Y:2010 | 07 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,824 | $3,000 | Not Implemented |
LE0303 # 11 Y:2010 | 11 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $973 | $1,000 | Implemented |
LE0303 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,931 | $25,900 | Not Implemented |
LE0303 # 05 Y:2010 | 05 | 2010 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,574 | $7,000 | Not Implemented |
LE0303 # 04 Y:2010 | 04 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,385 | $2,200 | Not Implemented |
LE0303 # 03 Y:2010 | 03 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,909 | $1,500 | Not Implemented |
LE0303 # 02 Y:2010 | 02 | 2010 | INSTALL TIMERS AND/OR THERMOSTATS | $10,520 | $650 | Implemented |
LE0303 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $26,348 | $1,672 | Implemented |
LE0303 # 08 Y:2010 | 08 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,378 | $3,000 | Not Implemented |
LE0303 # 09 Y:2010 | 09 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,351 | $800 | Implemented |
LE0303 # 10 Y:2010 | 10 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,131 | $15 | Implemented |
AM0568 # 09 Y:2010 | 09 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,330 | $0 | Not Implemented |
AM0568 # 08 Y:2010 | 08 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,340 | $9,176 | Not Implemented |
AM0568 # 06 Y:2010 | 06 | 2010 | INSTALL SKYLIGHTS | $4,820 | $13,100 | Not Implemented |
AM0568 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,655 | $2,000 | Not Implemented |
AM0568 # 04 Y:2010 | 04 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,780 | $500 | Not Implemented |
AM0568 # 03 Y:2010 | 03 | 2010 | OPTIMIZE PLANT POWER FACTOR | $22,400 | $54,380 | Not Implemented |