Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
59
matching recommendationsSIC | 2656 | Sanitary Food Containers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0079 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,953 | $392 | Implemented |
NL0079 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,292 | $128 | Implemented |
NL0079 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,949 | $768 | Implemented |
NL0079 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,699 | $10,600 | Implemented |
NL0079 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,356 | $2,892 | Implemented |
NL0079 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,509 | $4,500 | Implemented |
NL0079 # 01 Y:2023 | 01 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $30,717 | $54,394 | Implemented |
NL0079 # 08 Y:2023 | 08 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,809 | $2,875 | Implemented |
CO0590 # 04 Y:2006 | 04 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $560 | $658 | Implemented |
CO0590 # 03 Y:2006 | 03 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,660 | $100 | Implemented |
CO0590 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES | $560 | $500 | Implemented |
CO0590 # 10 Y:2006 | 10 | 2006 | INSTALL OCCUPANCY SENSORS | $1,280 | $680 | Implemented |
CO0590 # 12 Y:2006 | 12 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $160 | $500 | Implemented |
MA0556 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,840 | $2,131 | Implemented |
MA0556 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,534 | $529 | Implemented |
MA0556 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,167 | $10,200 | Implemented |
MA0556 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,720 | $10,350 | Implemented |
MA0556 # 02 Y:2004 | 02 | 2004 | OPTIMIZE PLANT POWER FACTOR | $13,042 | $6,750 | Implemented |
SD0248 # 03 Y:2000 | 03 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $4,532 | $7,536 | Implemented |
SD0248 # 07 Y:2000 | 07 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $11,600 | $1,000 | Implemented |
SD0248 # 04 Y:2000 | 04 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,585 | $0 | Implemented |
SD0248 # 11 Y:2000 | 11 | 2000 | INSTALL SYSTEM TO COLLECT SCRAP | $13,426 | $11,836 | Implemented |
SD0248 # 05 Y:2000 | 05 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,887 | $4,950 | Implemented |
SD0248 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,837 | $14,800 | Implemented |
SD0248 # 09 Y:2000 | 09 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,397 | $8,500 | Implemented |