Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
243
matching recommendationsSIC | 2657 | Folding Paperboard Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0397 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,221 | $10,086 | Implemented |
LE0397 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,396 | $1,000 | Implemented |
LE0397 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $116 | $1,914 | Implemented |
NC0520 # 03 Y:2014 | 03 | 2014 | INSTALL OCCUPANCY SENSORS | $2,633 | $5,706 | Implemented |
NC0520 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,056 | $22,494 | Implemented |
NC0520 # 09 Y:2014 | 09 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,603 | $200 | Implemented |
NC0520 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,992 | $100 | Implemented |
NC0520 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,324 | $400 | Implemented |
NC0520 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,219 | $80,659 | Implemented |
NC0520 # 04 Y:2014 | 04 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,255 | $413 | Implemented |
SF0438 # 02 Y:2013 | 02 | 2013 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $4,345 | $2,494 | Implemented |
SF0438 # 05 Y:2013 | 05 | 2013 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $3,906 | $4,995 | Implemented |
SF0438 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,090 | $4,441 | Implemented |
SF0438 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,414 | $840 | Implemented |
SF0438 # 04 Y:2013 | 04 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $176 | $105 | Implemented |
SF0438 # 06 Y:2013 | 06 | 2013 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $4,153 | $5,267 | Implemented |
MZ0122 # 01 Y:2013 | 01 | 2013 | INSULATE BARE EQUIPMENT | $21,142 | $3,276 | Implemented |
MZ0122 # 07 Y:2013 | 07 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,732 | $281 | Implemented |
MZ0122 # 09 Y:2013 | 09 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $576 | $500 | Implemented |
MZ0122 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $1,742 | $1,240 | Implemented |
MZ0122 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,872 | $1,308 | Implemented |
MZ0122 # 03 Y:2013 | 03 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $3,627 | $1,000 | Implemented |
MZ0122 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,176 | $4,981 | Implemented |
NC0486 # 02 Y:2013 | 02 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $150 | $25 | Implemented |
NC0486 # 01 Y:2013 | 01 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,365 | $4,000 | Implemented |