IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

599

matching recommendations
Reset
SIC 2657 Folding Paperboard Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0662 # 02 Y:2025 02 2025 USE BATTERY STORAGE FOR DEMAND CONTROL $291,442 $26,842 n/a
SD0662 # 06 Y:2025 06 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,545 $8,505 n/a
SD0662 # 09 Y:2025 09 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,422 $2,278 n/a
SD0662 # 10 Y:2025 10 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $167,076 $0 n/a
SD0662 # 08 Y:2025 08 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,646 $15,968 n/a
SD0662 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $40,111 $7,839 n/a
SD0662 # 01 Y:2025 01 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $78,473 $158,282 n/a
SD0662 # 05 Y:2025 05 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,635 $3,345 n/a
SD0662 # 07 Y:2025 07 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $30,392 $3,600 n/a
SD0662 # 03 Y:2025 03 2025 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $1,617 $2,200 n/a
LE0512 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $460,500 $3,500,000 Implemented
LE0512 # 02 Y:2021 02 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,168 $4,000 Implemented
LE0512 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,146 $7,700 Implemented
LE0512 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,086 $1,700 Not Implemented
LE0512 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,383 $4,000 Implemented
NL0026 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,570 $69,390 Implemented
NL0026 # 01 Y:2018 01 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $28,240 $65,000 Not Implemented
NL0026 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $1,000 Implemented
NL0026 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $0 Not Implemented
AM0764 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $20,080 $7,000 Not Implemented
AM0764 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,310 $1,000 Implemented
AM0764 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $820 $1,390 Not Implemented
AM0764 # 06 Y:2018 06 2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $720 $8 Implemented
AM0764 # 08 Y:2018 08 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $8 Not Implemented
AM0764 # 01 Y:2018 01 2018 USE EVAPORATION TO CONCENTRATE MATERIAL $13,350 $7,000 Not Implemented