IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 2657 Folding Paperboard Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0041 # 08 Y:2002 08 2002 $114,000 $335,000 Not Implemented
IC0041 # 07 Y:2002 07 2002 $16,000 $8,000 Implemented
IC0041 # 06 Y:2002 06 2002 RECOVER WASTE HEAT FROM EQUIPMENT $9,358 $8,500 Implemented
IC0041 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,918 $5,000 Implemented
IC0041 # 04 Y:2002 04 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $2,577 $10,720 Not Implemented
IC0041 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $569 $1,827 Not Implemented
IC0041 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,230 $1,440 Not Implemented
IC0041 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,772 $18,245 Implemented
BD0092 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $10,209 $825 Not Implemented
BD0092 # 08 Y:1997 08 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $502 $1,050 Not Implemented
BD0092 # 07 Y:1997 07 1997 MINIMIZE WATER USAGE $799 $1,550 Not Implemented
BD0092 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,041 $500 Not Implemented
BD0092 # 05 Y:1997 05 1997 INSULATE BARE EQUIPMENT $2,553 $2,736 Not Implemented
BD0092 # 04 Y:1997 04 1997 DIRECT WARMEST AIR TO COMBUSTION INTAKE $6,391 $9,400 Not Implemented
BD0092 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,184 $7,202 Not Implemented
BD0092 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,927 $14,447 Not Implemented
BD0092 # 09 Y:1997 09 1997 $50,018 $0 Not Implemented
WI0072 # 10 Y:1989 10 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $730 $0 Not Implemented
WI0072 # 08 Y:1989 08 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $165 $0 Not Implemented
WI0072 # 07 Y:1989 07 1989 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $283 $400 Not Implemented
WI0072 # 06 Y:1989 06 1989 INSTALL TIMERS AND/OR THERMOSTATS $301 $250 Implemented
WI0072 # 05 Y:1989 05 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $328 $700 Not Implemented
WI0072 # 04 Y:1989 04 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,052 $1,000 Not Implemented
WI0072 # 03 Y:1989 03 1989 IMPROVE LUBRICATION PRACTICES $1,866 $0 Implemented
WI0072 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $564 $3,238 Not Implemented