IAC logo
IAC Assessment: BD0092
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0092
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1997
Principal Product Folding Cartons
NAICS n/a
SIC 2657 - Folding Paperboard Boxes
Sales $10,000,000-$50,000,000
# of Employees 128
Plant Area (Sq.Ft.) 306,000
Annual Production 950,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $242,586 5,502,931 kWh $0.04
Electricity Demand $98,444 11,252 kW-months/year $8.75
Electricity Fees $20,173 - $ -
Natural Gas $182,177 64,229 MMBtu $2.84
TOTAL ENERGY COSTS $555,695
RECOMMENDED SAVINGS* $89,624 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Water Consumption Primary Product Increase in Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,927
Cost:
$14,447
$7,641 174,385 $3,286 375 - - - - - - - - $7,641
174,385
kWh
$3,286
375
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
%
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$10,209
Cost:
$825
$7,579 188,746 $2,630 301 - - - - - - - - $7,579
188,746
kWh
$2,630
301
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
%
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,184
Cost:
$7,202
$5,124 128,664 $2,060 236 - - - - - - - - $5,124
128,664
kWh
$2,060
236
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
%
04: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$6,391
Cost:
$9,400
- - - - $6,391 2,073 - - - - - - -
-
kWh
-
-
kW-months/year
$6,391
2,073
MMBtu
-
-
Tgal
-
-
$
-
-
%
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,553
Cost:
$2,736
- - - - $2,553 792 - - - - - - -
-
kWh
-
-
kW-months/year
$2,553
792
MMBtu
-
-
Tgal
-
-
$
-
-
%
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,041
Cost:
$500
$806 20,223 $235 27 - - - - - - - - $806
20,223
kWh
$235
27
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
%
07: 3.4151 MINIMIZE WATER USAGE Savings:
$799
Cost:
$1,550
- - - - - - $799 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$799
-
Tgal
-
-
$
-
-
%
08: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$502
Cost:
$1,050
- - - - - - - - $502 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$502
-
$
-
-
%
09: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$50,018
Cost:
-
- - - - - - - - - - $50,018 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$50,018
-
%
TOTAL RECOMMENDED Savings:
$89,624
Cost:
$37,710
$21,150 512,018 $8,211 939 $8,944 2,865 $799 - $502 - $50,018 - $21,150
512,018
kWh
$8,211
939
kW-months/year
$8,944
2,865
MMBtu
$799
-
Tgal
$502
-
$
$50,018
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ %
Electricity Usage Electricity Demand Natural Gas Water Consumption Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Water Consumption Primary Product Increase in Production