IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 2657 Folding Paperboard Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0787 # 01 Y:2008 01 2008 REDUCE VENTILATION AIR $47,843 $62,700 Implemented
UD0787 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,242 $107,122 Implemented
UD0787 # 10 Y:2008 10 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $388 $1,000 Implemented
UD0787 # 03 Y:2008 03 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,341 $6,560 Not Implemented
UD0787 # 05 Y:2008 05 2008 OPTIMIZE PLANT POWER FACTOR $7,098 $39,000 Not Implemented
UD0787 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,714 $2,828 Not Implemented
UD0787 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,351 $1,000 Implemented
UD0787 # 06 Y:2008 06 2008 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,330 $300 Not Implemented
UD0787 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $9,025 $2,424 Implemented
UD0787 # 08 Y:2008 08 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,656 $0 Not Implemented
UD0560 # 11 Y:1999 11 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $494 $0 Implemented
UD0560 # 10 Y:1999 10 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $563 $380 Implemented
UD0560 # 09 Y:1999 09 1999 RECOVER WASTE HEAT FROM EQUIPMENT $784 $1,060 Implemented
UD0560 # 08 Y:1999 08 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,081 $0 Implemented
UD0560 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,789 $330 Implemented
UD0560 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,148 $4,420 Implemented
UD0560 # 05 Y:1999 05 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,300 $0 Implemented
UD0560 # 04 Y:1999 04 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,825 $860 Not Implemented
UD0560 # 03 Y:1999 03 1999 CHANGE OPERATING CONDITIONS $15,400 $20,000 Not Implemented
UD0560 # 02 Y:1999 02 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $31,250 $0 Implemented
UD0560 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $880,000 $2,100,000 Not Implemented
UD0423 # 06 Y:1994 06 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $920 $0 Implemented
UD0423 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $17,559 $10,000 Not Implemented
UD0423 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,024 $400 Implemented
UD0423 # 03 Y:1994 03 1994 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,236 $30,000 Implemented