Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
460
matching recommendationsSIC | 2657 | Folding Paperboard Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0430 # 01 Y:2010 | 01 | 2010 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $264 | $0 | Not Implemented |
SD0430 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,152 | $100 | Not Implemented |
SD0430 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,250 | $1,671 | Not Implemented |
SD0430 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,949 | $800 | Implemented |
SD0430 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $1,126 | $1,029 | Not Implemented |
SF0375 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $75,147 | $244,092 | Implemented |
SF0375 # 08 Y:2009 | 08 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $191 | $945 | Not Implemented |
SF0375 # 10 Y:2009 | 10 | 2009 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $9,983 | $67,481 | Implemented |
SF0375 # 09 Y:2009 | 09 | 2009 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,842 | $12,018 | Implemented |
SF0375 # 04 Y:2009 | 04 | 2009 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $26,893 | $32,381 | Not Implemented |
SF0375 # 02 Y:2009 | 02 | 2009 | INSULATE BARE EQUIPMENT | $2,383 | $460 | Implemented |
SF0375 # 07 Y:2009 | 07 | 2009 | INSTALL OCCUPANCY SENSORS | $10,418 | $41,832 | Implemented |
SF0375 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,246 | $0 | Implemented |
SF0375 # 03 Y:2009 | 03 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $34,176 | $37,453 | Not Implemented |
SF0375 # 05 Y:2009 | 05 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,172 | $3,307 | Not Implemented |
UD0787 # 08 Y:2008 | 08 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,656 | $0 | Not Implemented |
UD0787 # 09 Y:2008 | 09 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,351 | $1,000 | Implemented |
UD0787 # 04 Y:2008 | 04 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $9,025 | $2,424 | Implemented |
UD0787 # 10 Y:2008 | 10 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $388 | $1,000 | Implemented |
UD0787 # 01 Y:2008 | 01 | 2008 | REDUCE VENTILATION AIR | $47,843 | $62,700 | Implemented |
UD0787 # 03 Y:2008 | 03 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,341 | $6,560 | Not Implemented |
UD0787 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,714 | $2,828 | Not Implemented |
UD0787 # 06 Y:2008 | 06 | 2008 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,330 | $300 | Not Implemented |
UD0787 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,242 | $107,122 | Implemented |
UD0787 # 05 Y:2008 | 05 | 2008 | OPTIMIZE PLANT POWER FACTOR | $7,098 | $39,000 | Not Implemented |