IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0318 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $572 $69 Implemented
IA0318 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $370 $202 Implemented
IA0318 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,933 $1,440 Implemented
IA0131 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $21,688 $64,875 Implemented
IA0131 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,393 $9,302 Implemented
IA0131 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,757 $390 Implemented
IA0131 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,181 $25 Implemented
KU0263 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,737 $5,000 Implemented
KU0263 # 03 Y:1988 03 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,211 $1,600 Implemented
KU0263 # 04 Y:1988 04 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,486 $1,308 Implemented
KU0263 # 05 Y:1988 05 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $219 $0 Implemented
KU0263 # 06 Y:1988 06 1988 SHUT OFF PILOTS IN STANDBY EQUIPMENT $187 $0 Implemented
KU0263 # 07 Y:1988 07 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $269 $0 Implemented