IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0165 # 08 Y:1992 08 1992 INSTALL SET-BACK TIMERS $150 $190 Implemented
AM0165 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,330 $2,520 Implemented
AM0165 # 02 Y:1992 02 1992 LOWER CEILING TO REDUCE CONDITIONED SPACE $6,300 $3,630 Implemented
AM0165 # 01 Y:1992 01 1992 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $23,570 $1,350 Implemented
UD0379 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $8,593 $9,000 Implemented
UD0379 # 03 Y:1992 03 1992 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,637 $750 Implemented
HO0025 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $330 $320 Implemented
HO0025 # 02 Y:1992 02 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $1,071 $1,072 Implemented
HO0025 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,322 $800 Implemented
KU0381 # 07 Y:1992 07 1992 RECOVER WASTE HEAT FROM EQUIPMENT $450 $716 Implemented
KU0380 # 09 Y:1992 09 1992 INSTALL TURBULATORS $1,424 $1,000 Implemented
KU0380 # 12 Y:1992 12 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8 $0 Implemented
KU0380 # 08 Y:1992 08 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,375 $3,500 Implemented
KU0380 # 07 Y:1992 07 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,034 $4,860 Implemented
KU0380 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $3,220 $4,298 Implemented
KU0381 # 09 Y:1992 09 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $429 $1,400 Implemented
KU0381 # 08 Y:1992 08 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $322 $0 Implemented
KU0381 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $751 $700 Implemented
KU0381 # 03 Y:1992 03 1992 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $150 $30 Implemented
KU0381 # 01 Y:1992 01 1992 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,545 $20 Implemented
KU0375 # 01 Y:1992 01 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $16,449 $20,000 Implemented
KU0375 # 09 Y:1992 09 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $449 $229 Implemented
KU0375 # 04 Y:1992 04 1992 RECOVER WASTE HEAT FROM EQUIPMENT $621 $150 Implemented
KU0375 # 02 Y:1992 02 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,970 $525 Implemented
KU0374 # 04 Y:1992 04 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,651 $1,785 Implemented