IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

129

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MAS019 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $2,999 $1,535 Not Implemented
MA0631 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,384 $27,090 Implemented
MA0631 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,021 $0 Implemented
MA0631 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $350 $200 Implemented
MA0631 # 03 Y:2008 03 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $609 $0 Implemented
MA0602 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,335 $96,992 Implemented
MA0602 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $79,413 $172,300 Not Implemented
MA0602 # 02 Y:2006 02 2006 USE MINIMUM SAFE OVEN VENTILATION $71,115 $115,075 Not Implemented
MA0602 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,691 $749 Implemented
MA0602 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $8,388 $4,050 Implemented
MA0602 # 06 Y:2006 06 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,526 $8,755 Not Implemented
MA0602 # 07 Y:2006 07 2006 OPTIMIZE PLANT POWER FACTOR $1,918 $700 Not Implemented
MA0602 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $1,122 $950 Implemented
MA0504 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $24,477 $22,000 Implemented
MA0504 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,658 $80,500 Implemented
MA0504 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,196 $0 Implemented
MA0504 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,901 $7,000 Implemented
MA0504 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,155 $13,100 Not Implemented
MA0504 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,725 $46,000 Not Implemented
MA0504 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $117,765 $284,800 Not Implemented
MA0502 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,771 $3,000 Not Implemented
MA0502 # 05 Y:2001 05 2001 REPLACE BOILER $1,908 $1,908 Not Implemented
MA0502 # 04 Y:2001 04 2001 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,510 $15,000 Not Implemented
MA0502 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,461 $6,200 Not Implemented
MA0502 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,860 $45,850 Not Implemented