Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
159
matching recommendationsSIC | 267 | Misc. Converted Paper Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0251 # 10 Y:2007 | 10 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $278 | $130 | Not Implemented |
SU0251 # 11 Y:2007 | 11 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $234 | $150 | Not Implemented |
SU0251 # 12 Y:2007 | 12 | 2007 | INSTALL OCCUPANCY SENSORS | $1,778 | $1,620 | Not Implemented |
SU0251 # 13 Y:2007 | 13 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,970 | $2,556 | Implemented |
SU0251 # 14 Y:2007 | 14 | 2007 | OPTIMIZE PLANT POWER FACTOR | $3,906 | $14,129 | Not Implemented |
MA0590 # 01 Y:2006 | 01 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $23,037 | $56,931 | Implemented |
MA0590 # 02 Y:2006 | 02 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,269 | $30,445 | Not Implemented |
MA0590 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,393 | $12,255 | Not Implemented |
MA0590 # 04 Y:2006 | 04 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,100 | $3,295 | Not Implemented |
MA0590 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,630 | $7,000 | Not Implemented |
MA0590 # 06 Y:2006 | 06 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,603 | $3,312 | Implemented |
MA0590 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,408 | $1,000 | Implemented |
MA0590 # 08 Y:2006 | 08 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $29,100 | $25,000 | Not Implemented |
MA0590 # 09 Y:2006 | 09 | 2006 | INSULATE BARE EQUIPMENT | $10,500 | $2,000 | Implemented |
MA0590 # 10 Y:2006 | 10 | 2006 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $9,818 | $6,420 | Implemented |
MA0590 # 11 Y:2006 | 11 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,286 | $21,300 | Not Implemented |
SU0207 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $206 | $0 | Implemented |
SU0207 # 02 Y:2005 | 02 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,133 | $0 | Not Implemented |
SU0207 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,791 | $477 | Implemented |
SU0207 # 04 Y:2005 | 04 | 2005 | USE SYNTHETIC LUBRICANT | $2,489 | $2,000 | Not Implemented |
SU0207 # 05 Y:2005 | 05 | 2005 | ADJUST VENTS TO MINIMIZE ENERGY USE | $21,600 | $21,422 | Not Implemented |
SU0207 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $55 | $92 | Implemented |
SU0199 # 01 Y:2005 | 01 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $144 | $0 | Implemented |
SU0199 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,830 | $0 | Not Implemented |
SU0199 # 03 Y:2005 | 03 | 2005 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $371,280 | $13,500 | Implemented |