IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0316 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,209 $3,200 Not Implemented
LE0316 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,621 $1,120 Not Implemented
LE0316 # 09 Y:2011 09 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,438 $23,800 Not Implemented
LE0316 # 10 Y:2011 10 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,860 $3,600 Not Implemented
LE0316 # 11 Y:2011 11 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,567 $3,205 Not Implemented
LE0316 # 12 Y:2011 12 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,182 $1,000 Not Implemented
LE0316 # 13 Y:2011 13 2011 INSTALL SKYLIGHTS $1,030 $22,500 Not Implemented
LE0191 # 01 Y:2004 01 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $19,209 $8,000 Not Implemented
LE0191 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,043 $2,500 Implemented
LE0191 # 03 Y:2004 03 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,591 $3,200 Not Implemented
LE0191 # 04 Y:2004 04 2004 OPTIMIZE PLANT POWER FACTOR $8,221 $2,500 Implemented
LE0191 # 05 Y:2004 05 2004 INSTALL TIMERS AND/OR THERMOSTATS $4,530 $750 Implemented
LE0191 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,195 $0 Not Implemented
LE0191 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,161 $200 Implemented
LE0191 # 08 Y:2004 08 2004 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $581 $0 Implemented
LE0191 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $719 $750 Not Implemented
WV0236 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,180 $4,900 Implemented
WV0236 # 02 Y:2002 02 2002 UTILIZE A LESS EXPENSIVE COOLING METHOD $826 $585 Implemented
WV0236 # 03 Y:2002 03 2002 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $29,035 $44,954 Not Implemented
WV0236 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,403 $124 Not Implemented
WV0236 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $37,820 $422 Implemented
WV0236 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,340 $84 Implemented
WV0236 # 07 Y:2002 07 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $1,206 $3,600 Implemented
WV0236 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $1,272 $750 Implemented
WV0236 # 09 Y:2002 09 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,994 $560 Implemented