IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0281 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,927 $4,000 Implemented
KU0281 # 02 Y:1989 02 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $960 $1,500 Implemented
KU0281 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $512 $214 Implemented
KU0281 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,778 $9,550 Implemented
KU0281 # 05 Y:1989 05 1989 RECOVER WASTE HEAT FROM EQUIPMENT $1,983 $500 Implemented
KU0281 # 06 Y:1989 06 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,023 $200 Not Implemented
KU0281 # 07 Y:1989 07 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $993 $0 Implemented
KU0262 # 01 Y:1988 01 1988 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $7,388 $500 Implemented
KU0262 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $250 Implemented
KU0262 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,009 $150 Implemented
KU0262 # 04 Y:1988 04 1988 INSTALL AUTOMATIC STACK DAMPER $340 $300 Not Implemented
KU0262 # 05 Y:1988 05 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $241 $400 Implemented
KU0204 # 01 Y:1986 01 1986 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $50,936 $300,000 Not Implemented
KU0204 # 02 Y:1986 02 1986 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $8,720 $3,000 Not Implemented
KU0204 # 03 Y:1986 03 1986 IMPROVE LUBRICATION PRACTICES $2,017 $1,600 Implemented
KU0204 # 04 Y:1986 04 1986 INSTALL AUTOMATIC STACK DAMPER $1,220 $700 Implemented
KU0204 # 05 Y:1986 05 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $715 $0 Implemented
KU0204 # 06 Y:1986 06 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $335 $0 Implemented
KU0204 # 07 Y:1986 07 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $732 $30 Implemented
KU0204 # 08 Y:1986 08 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $576 $50 Implemented
KU0204 # 09 Y:1986 09 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $155 $100 Implemented
KU0204 # 10 Y:1986 10 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $126 $0 Not Implemented