IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,112

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0266 # 09 Y:2001 09 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,027 $518 Implemented
IA0266 # 10 Y:2001 10 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,165 $585 Implemented
IA0266 # 11 Y:2001 11 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,767 $2,000 Implemented
IA0266 # 12 Y:2001 12 2001 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $123,691 $50,000 Not Implemented
IA0266 # 13 Y:2001 13 2001 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $231,300 $0 Implemented
IA0266 # 14 Y:2001 14 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $51,648 $32,000 Not Implemented
WI0400 # 01 Y:2001 01 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $104,000 $4,000 Not Implemented
WI0400 # 02 Y:2001 02 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,857 $10,000 Not Implemented
WI0400 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $1,503 $1,500 Not Implemented
WI0400 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $838 $3,744 Not Implemented
WI0400 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $211 $300 Not Implemented
WI0400 # 06 Y:2001 06 2001 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,277 $0 Not Implemented
WI0400 # 07 Y:2001 07 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $738 $2,000 Not Implemented
WI0400 # 08 Y:2001 08 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $605 $640 Implemented
WI0400 # 09 Y:2001 09 2001 INSTALL TIMERS AND/OR THERMOSTATS $209 $400 Implemented
WI0396 # 01 Y:2001 01 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $172,934 $560,000 Not Implemented
WI0396 # 02 Y:2001 02 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $40,600 $10,000 Not Implemented
WI0396 # 03 Y:2001 03 2001 USE A RAG RECYCLE SERVICE $11,777 $0 Not Implemented
WI0396 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $6,365 $4,500 Not Implemented
WI0396 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,350 $0 Not Implemented
WI0396 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,004 $1,920 Not Implemented
WI0396 # 07 Y:2001 07 2001 RECOVER WASTE HEAT FROM EQUIPMENT $3,983 $1,000 Not Implemented
WI0396 # 08 Y:2001 08 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $143 $30 Not Implemented
WV0207 # 01 Y:2001 01 2001 RECOVER WASTE HEAT FROM EQUIPMENT $279,346 $353,018 Not Implemented
WV0207 # 02 Y:2001 02 2001 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $24,920 $76,400 Not Implemented