IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1025 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $83,809 $25,133 Not Implemented
UD1025 # 10 Y:2020 10 2020 INSTALL EQUIPMENT TO MOVE PRODUCT $454,408 $375,000 Not Implemented
UD1025 # 06 Y:2020 06 2020 COMBINE UTILITY METERS $8,278 $0 Not Implemented
UD1025 # 05 Y:2020 05 2020 REDUCE EXCESSIVE BOILER BLOWDOWN $6,710 $5,224 Not Implemented
UD1025 # 07 Y:2020 07 2020 OPTIMIZE PLANT POWER FACTOR $3,612 $7,325 Not Implemented
UD1025 # 03 Y:2020 03 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,411 $4,000 Not Implemented
UD1025 # 09 Y:2020 09 2020 INSTALL OCCUPANCY SENSORS $11,875 $4,845 Not Implemented
UD1025 # 01 Y:2020 01 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,747 $0 Not Implemented
UD1025 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,051 $340 Implemented
UD1025 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,963 $26,366 Not Implemented
UD0964 # 09 Y:2017 09 2017 INSTALL SPECTRAL REFLECTORS / DELAMP $6,075 $0 Not Implemented
UD0964 # 05 Y:2017 05 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,749 $2,840 Not Implemented
UD0964 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,225 $21,449 Not Implemented
UD0964 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,000 $1,000 Not Implemented
UD0964 # 02 Y:2017 02 2017 USE OPTIMUM TEMPERATURE $652 $500 Not Implemented
UD0964 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,083 $0 Not Implemented
UD0964 # 03 Y:2017 03 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,847 $500 Not Implemented
UD0964 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,348 $36,424 Not Implemented
UD0964 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,522 $0 Not Implemented
UD0950 # 06 Y:2016 06 2016 REDUCE EXCESSIVE BOILER BLOWDOWN $195 $0 Not Implemented
UD0950 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,008 $10,000 Not Implemented
UD0950 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $671 $1,116 Not Implemented
UD0950 # 01 Y:2016 01 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $5,935 $5,000 Not Implemented
UD0950 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $4,004 $1,452 Not Implemented
UD0950 # 07 Y:2016 07 2016 INSTALL AUTOMATIC STACK DAMPER $424 $484 Not Implemented