IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

115

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0241 # 05 Y:2025 05 2025 INSTALL OCCUPANCY SENSORS $96 $368 n/a
WM0241 # 04 Y:2025 04 2025 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $552 $635 n/a
WM0241 # 01 Y:2025 01 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,950 $0 n/a
WM0241 # 02 Y:2025 02 2025 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,959 $6,000 n/a
WM0241 # 03 Y:2025 03 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,471 $2,249 n/a
WM0184 # 01 Y:2022 01 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,492 $6,200 Not Implemented
WM0184 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $87 $54 Not Implemented
WM0184 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $592 $0 Not Implemented
WM0184 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $779 $1,030 Not Implemented
WM0184 # 03 Y:2022 03 2022 USE RADIANT HEATER FOR SPOT HEATING $1,517 $3,265 Not Implemented
WM0184 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $844 $850 Not Implemented
WM0184 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $2,076 $1,190 Not Implemented
WM0003 # 06 Y:2012 06 2012 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $493 $99 Not Implemented
WM0003 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $137 $360 Implemented
WM0003 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $226 $120 Implemented
WM0003 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $2,091 $0 Not Implemented
WM0003 # 01 Y:2012 01 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,254 $600 Implemented
WM0003 # 03 Y:2012 03 2012 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,223 $0 Not Implemented
WM0003 # 07 Y:2012 07 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,160 $900 Not Implemented
IC0136 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,802 $9,080 Implemented
IC0136 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $2,224 $5,038 Implemented
IC0136 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,294 $5,851 Not Implemented
IC0136 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,389 $3,105 Implemented
IC0136 # 06 Y:2007 06 2007 REDUCE VENTILATION AIR $23,044 $0 Not Implemented
IC0136 # 07 Y:2007 07 2007 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $9,042 $26,000 Not Implemented