IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

106

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0165 # 01 Y:1992 01 1992 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $23,570 $1,350 Implemented
AM0165 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,330 $2,520 Implemented
AM0165 # 02 Y:1992 02 1992 LOWER CEILING TO REDUCE CONDITIONED SPACE $6,300 $3,630 Implemented
AM0165 # 08 Y:1992 08 1992 INSTALL SET-BACK TIMERS $150 $190 Implemented
AM0165 # 04 Y:1992 04 1992 REDUCE FLUID FLOW RATES $2,710 $0 Not Implemented
AM0165 # 03 Y:1992 03 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,915 $3,450 Not Implemented
AM0165 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,750 $0 Not Implemented
AM0165 # 07 Y:1992 07 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $920 $920 Not Implemented
CO0253 # 02 Y:1992 02 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $100 Not Implemented
CO0253 # 14 Y:1992 14 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,800 $6,820 Not Implemented
CO0253 # 13 Y:1992 13 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,380 $13,860 Not Implemented
CO0253 # 12 Y:1992 12 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,150 $12,000 Not Implemented
CO0253 # 11 Y:1992 11 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,430 $16,710 Not Implemented
CO0253 # 10 Y:1992 10 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,250 $7,800 Not Implemented
CO0253 # 09 Y:1992 09 1992 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $790 $900 Not Implemented
CO0253 # 08 Y:1992 08 1992 RECOVER WASTE HEAT FROM EQUIPMENT $2,520 $2,220 Not Implemented
CO0253 # 07 Y:1992 07 1992 INSULATE BARE EQUIPMENT $400 $440 Not Implemented
CO0253 # 06 Y:1992 06 1992 USE POWER DURING OFF-PEAK PERIODS $1,040 $250 Not Implemented
CO0253 # 05 Y:1992 05 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,350 $800 Not Implemented
CO0253 # 04 Y:1992 04 1992 REDUCE VENTILATION AIR $4,140 $1,200 Not Implemented
CO0253 # 03 Y:1992 03 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,410 $100 Not Implemented
CO0253 # 01 Y:1992 01 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,800 $20 Not Implemented
UD0379 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $454 $250 Not Implemented
UD0379 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $8,593 $9,000 Implemented
UD0379 # 03 Y:1992 03 1992 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,637 $750 Implemented