IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
Reset
SIC 2671 Paper Coated & Laminated, Packaging
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0036 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,457 $2,900 Implemented
IC0036 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,201 $53,875 Implemented
IC0036 # 05 Y:2002 05 2002 INSTALL SET-BACK TIMERS $1,686 $582 Not Implemented
IC0036 # 06 Y:2002 06 2002 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $50,899 $6,720 Implemented
IC0036 # 07 Y:2002 07 2002 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $14,346 $7,100 Not Implemented
IC0036 # 08 Y:2002 08 2002 AUTOMATE PAYROLL SYSTEM $54,800 $9,262 Implemented
IC0036 # 09 Y:2002 09 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $33,746 $19,500 Not Implemented
BD0144 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,585 $3,180 Implemented
BD0144 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $804 $830 Implemented
BD0144 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $772 $675 Not Implemented
BD0144 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,614 $2,480 Not Implemented
BD0144 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $185 $350 Implemented
BD0144 # 06 Y:1999 06 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $203,250 $2,000 Not Implemented
BD0144 # 07 Y:1999 07 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $49,400 $12,647 Not Implemented
BD0144 # 08 Y:1999 08 1999 INSTALL OCCUPANCY SENSORS $23,400 $10,000 Implemented
BD0068 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,122 $12,270 Implemented
BD0068 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,590 $800 Implemented
BD0068 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,611 $2,563 Implemented
BD0068 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $1,441 $1,500 Not Implemented
BD0068 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,531 $2,590 Implemented
BD0068 # 06 Y:1996 06 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,111 $1,020 Implemented
BD0068 # 07 Y:1996 07 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $562 $660 Not Implemented
BD0068 # 08 Y:1996 08 1996 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $11,996 $9,045 Not Implemented
WI0228 # 01 Y:1995 01 1995 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $16,786 $30,000 Not Implemented
WI0228 # 02 Y:1995 02 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,721 $200 Not Implemented