IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
Reset
SIC 2671 Paper Coated & Laminated, Packaging
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0314 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,286 $160 n/a
IC0314 # 11 Y:2024 11 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,325 $48,415 n/a
IC0314 # 02 Y:2024 02 2024 INSTALL AN UNINTERUPTABLE POWER SUPPLY $48,560 $367,354 n/a
IC0314 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,007 $683 n/a
IC0314 # 09 Y:2024 09 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,295 $652 n/a
IC0314 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $79,445 $420,971 n/a
IC0314 # 07 Y:2024 07 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,800 $30,177 n/a
IC0314 # 10 Y:2024 10 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,150 $4,200 n/a
IC0314 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,076 $0 n/a
IC0314 # 06 Y:2024 06 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,212 $376 n/a
IC0314 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,527 $0 n/a
BD0480 # 06 Y:2016 06 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $502 $1,050 n/a
BD0480 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,253 $17,970 n/a
BD0480 # 01 Y:2016 01 2016 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $19,348 $3,000 n/a
BD0480 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,798 $20,250 n/a
BD0480 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,552 $15 n/a
BD0480 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $1,806 $975 n/a
BD0480 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300 $350 n/a
BD0480 # 07 Y:2016 07 2016 USE POWER DURING OFF-PEAK PERIODS $311 $20 n/a
IC0157 # 08 Y:2009 08 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,436 $1,524 Implemented
IC0157 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,603 $805 Implemented
IC0157 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $968 $1,964 Implemented
IC0157 # 05 Y:2009 05 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,159 $1,572 Not Implemented
IC0157 # 04 Y:2009 04 2009 INSULATE BARE EQUIPMENT $769 $470 Not Implemented
IC0157 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,780 $9,923 Implemented