IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 2671 Paper Coated & Laminated, Packaging
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0482 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,890 $100 Implemented
NC0482 # 07 Y:2013 07 2013 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $14,522 $24,104 Not Implemented
NC0482 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $11,303 $4,000 Not Implemented
NC0482 # 05 Y:2013 05 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $139,540 $300,000 Not Implemented
NC0482 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,981 $2,248 Not Implemented
NC0482 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $5,539 $2,682 Not Implemented
NC0482 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76,174 $132,415 Not Implemented
NC0482 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,366 $33,811 Implemented
NC0322 # 02 Y:2005 02 2005 $8,353 $2,650 Implemented
NC0322 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $217 $2,000 Implemented
NC0322 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $723 $298 Implemented
NC0322 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $462 $100 Implemented
NC0322 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,592 $821 Implemented
NC0322 # 04 Y:2005 04 2005 DEVELOP A REPAIR/REPLACE POLICY $573 $0 Implemented
NC0322 # 03 Y:2005 03 2005 $74,009 $100,000 Not Implemented
NC0322 # 01 Y:2005 01 2005 $139,400 $9,500 Implemented
OD0022 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,327 $25,510 Implemented
OD0022 # 02 Y:1995 02 1995 METER WASTE WATER $6,284 $1,521 Implemented
OD0022 # 03 Y:1995 03 1995 MODERATE COOLING TOWER OUTLET TEMPERATURE $3,379 $0 Not Implemented
OD0022 # 04 Y:1995 04 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,277 $4,655 Implemented
OD0022 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,120 $4,008 Implemented
OD0022 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,353 $3,562 Implemented
OD0022 # 07 Y:1995 07 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,807 $400 Implemented