IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

406

matching recommendations
Reset
SIC 2672 Paper Coated And Laminated, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0623 # 09 Y:1998 09 1998 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,230 $0 Not Implemented
MA0396 # 01 Y:1997 01 1997 USE MAGNETIC TECHNOLOGY TO TREAT WATER $7,580 $9,347 Not Implemented
MA0396 # 02 Y:1997 02 1997 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $5,492 $11,700 Implemented
MA0396 # 03 Y:1997 03 1997 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $4,207 $14,329 Not Implemented
MA0396 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,606 $75 Implemented
MA0396 # 05 Y:1997 05 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $1,409 $60 Implemented
MA0396 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $819 $102 Not Implemented
MA0396 # 07 Y:1997 07 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $182 $132 Not Implemented
WI0230 # 01 Y:1995 01 1995 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $12,947 $0 Not Implemented
WI0230 # 02 Y:1995 02 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,633 $0 Implemented
WI0230 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $2,042 $2,089 Implemented
WI0230 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $442 $585 Implemented
WI0230 # 05 Y:1995 05 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,124 $500 Implemented
WI0230 # 06 Y:1995 06 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,111 $0 Not Implemented
WI0230 # 07 Y:1995 07 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,098 $0 Implemented
MA0301 # 01 Y:1994 01 1994 REDUCE FLUID FLOW RATES $480,000 $657,000 Implemented
MA0301 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,698 $27,600 Not Implemented
MA0301 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,256 $4,383 Implemented
MA0301 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,228 $0 Implemented
MA0301 # 05 Y:1994 05 1994 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $3,790 $1,236 Not Implemented
MA0301 # 06 Y:1994 06 1994 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $1,830 $5,906 Not Implemented
MA0301 # 07 Y:1994 07 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,277 $2,540 Not Implemented
CO0253 # 01 Y:1992 01 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,800 $20 Not Implemented
CO0253 # 02 Y:1992 02 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $100 Not Implemented
CO0253 # 03 Y:1992 03 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,410 $100 Not Implemented