IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

401

matching recommendations
Reset
SIC 2672 Paper Coated And Laminated, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0256 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $1,207 $1,200 Not Implemented
LE0256 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,990 $11,733 Not Implemented
MA0602 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $79,413 $172,300 Not Implemented
MA0602 # 02 Y:2006 02 2006 USE MINIMUM SAFE OVEN VENTILATION $71,115 $115,075 Not Implemented
MA0602 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,335 $96,992 Implemented
MA0602 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,691 $749 Implemented
MA0602 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $8,388 $4,050 Implemented
MA0602 # 06 Y:2006 06 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,526 $8,755 Not Implemented
MA0602 # 07 Y:2006 07 2006 OPTIMIZE PLANT POWER FACTOR $1,918 $700 Not Implemented
MA0602 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $1,122 $950 Implemented
WI0498 # 01 Y:2005 01 2005 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $0 $0 Not Implemented
WI0498 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $45,520 $17,500 Not Implemented
WI0498 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,079 $20,340 Not Implemented
WI0498 # 04 Y:2005 04 2005 DISTILL CONTAMINATED SOLVENTS FOR REUSE $11,414 $21,105 Not Implemented
WI0498 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,036 $11,640 Not Implemented
WI0498 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $3,268 $0 Not Implemented
WI0498 # 07 Y:2005 07 2005 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $2,638 $7,500 Not Implemented
WI0498 # 08 Y:2005 08 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,161 $0 Not Implemented
WI0498 # 09 Y:2005 09 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $862 $640 Not Implemented
WI0498 # 10 Y:2005 10 2005 INSTALL OCCUPANCY SENSORS $509 $600 Not Implemented
WI0494 # 01 Y:2005 01 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,360 $11,500 Not Implemented
WI0494 # 02 Y:2005 02 2005 DISTILL CONTAMINATED SOLVENTS FOR REUSE $12,456 $16,500 Not Implemented
WI0494 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,231 $12,960 Implemented
WI0494 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,060 $6,060 Not Implemented
WI0494 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $1,037 $1,000 Not Implemented