IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 2672 Paper Coated And Laminated, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0680 # 03 Y:2013 03 2013 REPAIR AND ELIMINATE STEAM LEAKS $490 $230 Implemented
CO0680 # 02 Y:2013 02 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,370 $31,720 Not Implemented
CO0680 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,930 $1,310 Implemented
CO0549 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $6,130 $3,800 Not Implemented
CO0549 # 01 Y:2004 01 2004 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $29,210 $116,000 Not Implemented
CO0549 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,000 $27,900 Not Implemented
CO0549 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,920 $510 Implemented
CO0549 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,780 $60 Not Implemented
CO0549 # 06 Y:2004 06 2004 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $650 $500 Implemented
CO0549 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $390 $360 Not Implemented
CO0549 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,840 $58,140 Implemented
CO0253 # 08 Y:1992 08 1992 RECOVER WASTE HEAT FROM EQUIPMENT $2,520 $2,220 Not Implemented
CO0253 # 14 Y:1992 14 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,800 $6,820 Not Implemented
CO0253 # 13 Y:1992 13 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,380 $13,860 Not Implemented
CO0253 # 12 Y:1992 12 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,150 $12,000 Not Implemented
CO0253 # 11 Y:1992 11 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,430 $16,710 Not Implemented
CO0253 # 10 Y:1992 10 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,250 $7,800 Not Implemented
CO0253 # 09 Y:1992 09 1992 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $790 $900 Not Implemented
CO0253 # 07 Y:1992 07 1992 INSULATE BARE EQUIPMENT $400 $440 Not Implemented
CO0253 # 06 Y:1992 06 1992 USE POWER DURING OFF-PEAK PERIODS $1,040 $250 Not Implemented
CO0253 # 05 Y:1992 05 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,350 $800 Not Implemented
CO0253 # 04 Y:1992 04 1992 REDUCE VENTILATION AIR $4,140 $1,200 Not Implemented
CO0253 # 03 Y:1992 03 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,410 $100 Not Implemented
CO0253 # 02 Y:1992 02 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $100 Not Implemented
CO0253 # 01 Y:1992 01 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,800 $20 Not Implemented