IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 2672 Paper Coated And Laminated, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0286 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,921 $25,494 Implemented
LE0286 # 03 Y:2009 03 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,875 $10,000 Not Implemented
LE0286 # 02 Y:2009 02 2009 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $15,000 $40,000 Not Implemented
LE0286 # 01 Y:2009 01 2009 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $20,166 $9,360 Not Implemented
LE0286 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,170 $1,152 Not Implemented
LE0286 # 05 Y:2009 05 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,022 $800 Not Implemented
LE0286 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,998 $192 Implemented
LE0286 # 07 Y:2009 07 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,833 $350 Implemented
LE0286 # 08 Y:2009 08 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,174 $100 Implemented
LE0256 # 01 Y:2007 01 2007 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $101,767 $50,000 Not Implemented
LE0256 # 02 Y:2007 02 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $15,602 $5,000 Not Implemented
LE0256 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,536 $15,000 Not Implemented
LE0256 # 04 Y:2007 04 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,965 $35,200 Implemented
LE0256 # 05 Y:2007 05 2007 USE RADIANT HEATER FOR SPOT HEATING $4,138 $5,000 Not Implemented
LE0256 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,217 $500 Implemented
LE0256 # 07 Y:2007 07 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $689 $500 Not Implemented
LE0256 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $1,207 $1,200 Not Implemented
LE0256 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,990 $11,733 Not Implemented
HO0205 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,560 $11,408 Implemented
HO0205 # 07 Y:1999 07 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,260 $24,000 Implemented
HO0205 # 06 Y:1999 06 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,015 $27,500 Not Implemented
HO0205 # 05 Y:1999 05 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,237 $833 Not Implemented
HO0205 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,757 $5,030 Implemented
HO0205 # 03 Y:1999 03 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,069 $0 Implemented
HO0205 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,922 $12,583 Not Implemented